Riverside Retail Park

Riverside Retail Park

TJ Hughes Enabling Works

The proposed scheme was for the extension and subdivision of Unit 3 which was a 2 Nr non-consecutive phased programme of works. Enabling works to include an asbestos survey.

Key Elements Included on Unit 3A Phase 1 & Unit 3B Phase 2

  • De gas of existing Air-con systems,
  • Cut back existing waste and water,
  • Remove existing shop fitting perimeters,
  • Remove existing ceilings,
  • Remove partitioned / division walls,
  • Strip out existing floor finishes back to original concrete slab (Adhesive and Latex)
  • Remove existing front canopy and de-glaze
  • Strip back external cladding and remove steelwork structures
  • Break out and remove brickwork of main entrance – retain structural steel work
  • Remove existing M&E
  • Deglaze existing shopfront windows and reduce height of brick stall risers
  • Build up new jumbo stud divisions walls
  • Flanking fire protection
  • Installation of new purlins
  • New M & E Services
  • Installation of new shop front / Kingspan Microrib Cladding and new signage / glazing
  • Roller shutter to be installed
  • External reforming of block paved main entrance
  • Roof repairs
  • Decoration and making good
  • Installation of new stub stack and connection to mains system

 

Key Facts

Project Management: MGMP

Duration: 6 Weeks

 

Clients View    

“I have been working with Dave Swinburne and his team for many years now and they never disappoint with what is asked of them” Ross Holland at MGMP

 

Interclass Fit-Out cover all activities from site preparation, creation of access routes, and the installation of facilities like security fencing, ramps, and placing of signs, to include internal site preparation.

The result is a site that enables not only construction teams and materials to enter and begin work safely and efficiently, but neighbouring buildings and infrastructure to keep functioning safely and without impediment.

When it comes to Enabling Works, Interclass Fit-Out have developed an enviable reputation in providing cost planning and programming.

With a wealth of experience Interclass are able to work with consultants, project managers working towards producing cost effective long term solutions that meet all involved parties’ aspirations.

Project Description

Client: British Airways Pension Trust
Location: Unit 3A Riverside Retail Park Chelmsford
Value: £200,000