Perton Lakes Perton

Perton Lakes Perton

Perton Lakes

Project Description: The proposed Works comprised the refurbishment and reinstatement of footpaths set within Perton Lakes and woods and adjacent to live areas of the general public and children’s play areas which were to be kept accessible at all times, Interclass to clear areas and debris along edges of footpath and to dispose of all waste.

As the Prime Contractor Interclass were ultimately responsible for delivery of the overall project service delivery and with whom the Contract with the Council was made.

Scope of Works and delivery relevant to contract – Upgrade Footpath

  • Excavate for, supply and lay as necessary 20mm down MOT, to bring the existing stone to a depth of 150mm following compaction
  • Excavate for, supply and lay 150mm x 50mm concrete bull nosed edging stones
  • Supply and lay 40mm tarmac basecoat following compaction
  • Supply and 20mm tarmac topcoat
  • Remove all arising’s off site to a licensed tip
  • Level any excavated soil to bring ground level to finished kerb level

Client View: “I have very pleased with the works Interclass have undertaken it has transformed the area and will look to use Interclass on future projects” Sharon Reynolds – Estates South Staffordshire Council

Project Description

Client: South Staffordshire Council, Wolverhampton Road, Codsall WV8 1PX
Location: Wombourne, Perton, Gt Wyrley
Value: £32,193.00